Overview
When it comes to temporary or backup power, getting your equipment up and running correctly is critical. Properly setting up your AIRMAN® generator is key to ensuring reliable performance and extending equipment life. This guide provides everything you need to confidently install and operate your ANA generator.
Step 1: Pre-Installation Preparation
Before installation begins, take time to plan. A few upfront checks can save hours of troubleshooting later.
- Assess Your Power Needs
-
- Determine whether your application requires single-phase or three-phase power.
- Identify the correct voltage and amperage needed for your tools or equipment.
- Select the Right Generator or System
- Choose a unit from ANA’s full product line based on load size, application type, and runtime needs.
- Consider add-ons like battery kits, SmartLoad™ activation, or auxiliary fuel connections.
- Prepare the Installation Site
-
- Make sure your location is flat, stable, and properly ventilated.
- Verify any required local permits or compliance standards before setup.
Step 2: Installation and Connection
Now it's time to install and configure your equipment safely.
- Position the Generator
- Set your unit on a level surface with ample space for airflow and routine maintenance access.
- Keep clearance around the generator as specified in the installation manual.
- Connect Electrical Components
- Secure all power cables, checking phase and voltage settings carefully.
- Use the control panel to select the correct operating parameters.
- Check Fuel and Fluid Levels
- Fill the fuel tank and top off oil and coolant as required.
- For longer runtimes, connect to an auxiliary fuel tank if applicable.
Step 3: Initial Startup and Safety Check
You're almost ready to power on—just a few final steps.
- Perform a System Check
-
Inspect all wiring, fittings, and safety features.
-
Ensure the emergency shutdown system is active and accessible.
-
Start the unit using the manufacturer's recommended process.
-
Monitor performance and look for unusual noises, vibration, or output inconsistencies.Power On the Generator
-
Step 4: Optimize and Maintain Performance
Once your system is running, take steps to fine-tune efficiency.- Activate SmartLoad™ (If Equipped)
- This system automatically adjusts load to prevent wet stacking and low-efficiency operation.
- SmartLoad™ engages or disengages resistive load to protect your engine over time.
- Run Equipment Test Loads
- Connect your actual tools or systems to simulate a real use scenario.
- Document baseline performance metrics for future maintenance tracking.
- Follow your unit's manual to determine service intervals.
- Use ANA’s support resources to maintain performance and track any issues early.Set a Maintenance Schedule
Step 5: Access Support and Resources
Need more help? ANA makes it easy to get the support you need.- Explore the ANA Knowledge Base
- Access quick-start guides, user manuals, videos, and troubleshooting tools.
- Bookmark articles for future reference as your equipment gets used.
- Reach out for technical help or product-specific questions via anacorp.com or your regional sales representative.Contact ANA Support
Final Thought